U.S. Route 122[II], is a placement of U.S. Route 22, which was chosen in 1926 as part of the highway system, upcoming in on the Phillipsburg-Easton Bridge. The route continuous as U.S. Route 22 until the end of the bypass around Phillipsburg, which US 22 was transferred to the bypass.